Pure Gold Mining
drills 33.1 g/t gold
over 3.4 metres
PURE GOLD MINING INC. [PGM-TSXV;
PUR-LSE] reports mine development at
the Pure Gold Red Lake Mine in north-
west Ontario, initiated as part of the
test mining program, has resumed, and
exploration drilling in close proximity to
this development has intersected high-
grade gold mineralization from both infill
and step-out drill holes. Drilling tested
potential for growth of ore zones that will
provide initial feed for the mill and has
yielded positive results suggesting strong
mine continuity and the potential for
mining stope expansion.
Results received and compiled will
be integrated into short-term mine plan-
ning. The Pure Gold Red Lake Mine is
currently under construction and under-
ground development is approximately
four months ahead of the feasibility
schedule. The first gold pour is expected
in Q4 2020.
Drilling highlights:
• 34.1 g/t gold over 2.2 metres from drill
hole PG19-710; including
• 64.6 g/t gold over 1.0 metre;
33.1 g/t gold over 3.4 metres from drill
hole PG19-719; including
• 79.4 g/t gold over 1.4 metres;
13.2 g/t gold over 6.3 metres from drill
hole PG19-735; including
• 6.3 g/t gold over 2.0 metres.
Acquisition and installation of key
infrastructure for underground mine
operations has commenced. Active de-
watering of the underground mine is
underway. Underground services includ-
ing water and electrical supply and
communications have been upgraded
in the ramp and haulage of stockpiled
test mining material to surface is under-
way. As part of the test mining program,
pre-production underground ramp
development began ahead of schedule
and is progressing quickly.