Resource World Magazine

Resource World - Aug-Sept 2016 - Vol 14 Iss 5

Issue link: http://resourceworld.uberflip.com/i/712968

Contents of this Issue

Navigation

Page 40 of 67

a u g u s t / s e p t e m b e r 2 0 1 6 www.resourceworld.com 41 Diamond drilling of the Thule mineral- ized halo has returned encouraging results. Hole S-24 averaged 0.7% copper over 319.73 metres with higher-grade zones including 48.77 metres of 1.86% copper. The hole ended in 0.25% copper. Highland Valley averages below 0.3% copper. Two zones exist around the former Craigmont ore body with proven ore grades – Body 3 and the Embayment. There are several other zones exhibit- ing surface copper mineralization which Nicola plans to investigate. A recent trenching program returned samples rang- ing up to 1.86% copper. The Embayment, WP, Titan Queen, Eric and Marb zones will be the focus of the drilling program. Part of the Craigmont operations were underground and it is a bonus for Nicola that the workings can be rehabilitated which will enable company geologists to examine copper mineralization in situ. Lastly, Nicola also owns the Treasure Mountain silver-lead zinc mine, currently on care and maintenance, 27 km east of Hope, BC near the Coquihalla Highway that leads to the mill. The mine is a stand- alone project with complete camp facilities and related workshops, etc. The Treasure Mountain Mine has four levels with total vein indicated resources of 33,000 tonnes averaging 828 g/t silver, 4.16% lead and 3.8% zinc, for 880,000 oz silver, 3.03 million lbs lead and 2.76 million lbs zinc. Inferred resources are 3.58 million oz silver, 7.37 mil- lion oz lead and 11.54 million lbs zinc. No work at the mine itself is planned for 2016; however, some extremely high- grade silver samples at the MB Zone on the northern backside of the mountain nearby will be followed up this summer. An interesting sidebar is Nicola Mining's plans to re-seed the old tailings impoundment area. The idea is to acquire unwanted salt-contaminated soil from Vancouver area construction projects to provide a layer on top of the tailings that can support local flora. Nicola Mining management has imple- mented a sound business strategy whereby exploration costs will be partially covered by cash flow. n

Articles in this issue

Links on this page

Archives of this issue

view archives of Resource World Magazine - Resource World - Aug-Sept 2016 - Vol 14 Iss 5