Resource World Magazine

Resource World - August-Sept 2017 - Vol 15 Issue 5

Issue link: http://resourceworld.uberflip.com/i/855838

Contents of this Issue

Navigation

Page 46 of 79

A U G U S T / S E P T E M B E R 2 0 1 7 www.resourceworld.com 47 tonnes at 3.07% copper, 4.23% zinc, 0.73% lead, 0.63 g/t gold and 47.6 g/t silver for 2.4 billion pounds of contained copper and 3.4 billion pounds of contained zinc. The company has also begun to prepare a pre-feasibility study which is anticipated to be complete in Q1, 2018. The project is in the Ambler Mining District about 470 km northwest of Fairbanks. At Trilogy Metal's Bornite Project, approximately 25 km southwest of the Arctic Project, a 12,000-metre (US $10 mil- lion) exploration drill program is underway and focused on drilling the extensions of the mineralization last drilled by the com- pany in 2013. During the 2013 exploration program the company completed 8,142 metres of drilling with 4,684 metres drilled at the Ruby Creek Zone and 3,458 metres drilled at the South Reef Zone where the company highlighted drill hole RC13-224 which intersected two mineralized inter- vals, starting at 513.3 metres and ending at 754.6 metres (241.3-metre interval), for a combined 236.0-metre composite interval with a weighted average grade of 1.90% copper, and comprised of 229.4 metres at a grade of 1.73% copper and 6.6 metres grading 7.70% copper. In Alaska's Western Region, the Graphite One Resources Inc. [GPH- TSXV] Graphite Creek Project has an indicated resource of 17.95 million tonnes at 6.3% graphitic carbon with an inferred resource of 154.3 million tonnes at 5.7% Cg, using a 3% cut-off grade. In January 2017, Graphite One completed a prelimi- nary economic assessment which projected a Net Present Value for the project on a pre-tax basis of US $1,037 million using a 10% discount rate, with an Internal Rate of Return of 27%. On a post-tax basis, the NPV is projected at US $616 million using a 10% discount rate, with an Internal Rate of Return of 22%. Annual production of CSG and other graphite specialty materials is projected at 55,350 metric tonnes when full production is reached in year six. A minimum of 40 years of indicated and inferred resources grading 7% Cg (graph- ite) have been identified. n

Articles in this issue

Links on this page

Archives of this issue

view archives of Resource World Magazine - Resource World - August-Sept 2017 - Vol 15 Issue 5