Resource World Magazine

Resource World - February-March 2018 - Vol 16 Issue 2

Issue link: http://resourceworld.uberflip.com/i/937377

Contents of this Issue

Navigation

Page 26 of 101

One of the Highest-grade/Lowest Impurity Lithium Deposits in the World Neo Lithium improves positive Argentine PEA Corporate Prof ile NLC-TSXV NTTHF-OTCQX NE2-FSE www.neolithium.ca Created by Resource World in partnership wlith Neo Lithium Corp. Toronto-based Neo Lithium Corp. recently filed a technical report demonstrating a major CAPEX reduction relating to the al- ready positive Preliminary Economic As- sessment of its 100%-owned Tres Quebra- das 3Q lithium brine project in Argentina. The improved economics of the project comes at an opportune time in the bur- geoning lithium ion battery industry. Re- cent developments in the electric vehicle sector include solving the "range anxiety" challenge with better battery technology. This has now been bolstered by Tesla in- troducing its new semi tractor-trailer with a range of 800 km as well as delivering a gi- ant battery to Australia to power a town of 30,000 people – the first time this has been possible. Before these developments, global bat- tery consumption was forecast to increase, on average, five times over the next 10 years. Today, lithium carbonate sells for over US $13,000/tonne for long term con- tracts and over US $20,000/tonne spot pric- ing in China. These new advancements bode well for an increasing demand for lithium ion bat- teries – not just for electric vehicles but also for the growing consumer electronic de- vice market. Neo Lithium is well positioned to participate in the increasing lithium ion battery demand with the construction of its lithium brine mining operation on the Puna Plateau at the southern end of the lithium Triangle in mining-friendly Catama- rca Province. Neo Lithium's 3Q Project, which hosts one of the highest grade lithium deposits in the world, covers over 350 km 2 with a sa- lar (salt lake) of some 150 km 2 . The 16% CA- PEX reduction decreased from US $588.7 million to US $490.2 million through the re- location of evaporation ponds, a cost sav- ings of US $98.5 million. Updated econom- ics are as follows: US $1.2 billion after-tax NPV at 8% discount rate, an Internal Rate of Return (IRR) of 27.9% and a payback period of one year and eight months. When in commercial production, the mine will have an average steady-state production rate of 35,000 tonnes of lith- ium carbonate per year based on simple and proven solar evaporation technology. Starting with a three-year ramp up period commencing in 2021, the expected mine life is 20 years with a fully loaded operating cost of US $2,791/tonne of lithium carbon- ate. The maiden resource estimate released on May 23, 2017 for the 3Q Project identi- fied the following lithium carbonate re- sources: 1,339,546 tonnes of inferred re- sources at 713 mg/L and 714,242 tonnes of measured and indicated resources at 716 mg/L at a cut off of 520 mg/L lithium. At a cut off of 400 mg/L lithium, the 3Q Project hosts 2.23 million tonnes inferred resources and 1.22 million tonnes measured and indi- cated lithium carbonate equivalent with an average grade of 577 mg/L lithium. In addi- tion, the resource has the lowest combined impurities of sulphate and magnesium of any known salar which directly translates into low cost operations. Of note, 90% of the lithium resources are close to surface –100 metres in depth and above. However, the company has demon- strated there is a depth of 600 metres of potential brine-bearing sediments, which means resource can be increased and mine life could be significantly extended. The current work program is fully per- mitted to feasibility. The current focus is on baseline studies and analysis for flora, fauna, limnology and microbiology for the summer, fall and winter has been com- pleted. Social and archeology studies have also been completed. Soil, air, landscape and paleontology studies are expected to be completed shortly. These environ- mental studies are required to support the required full Environmental Impact As- sessment (EIA) report, along with an eco- nomic study, to obtain a mine construc- tion permit. The EIA report is expected to be delivered to the mining authorities in the first half of 2018 and is anticipated to be the final permit required before mine construction. An easement agreement has been granted for mine construction and road access to the site. Neo Lithium will produce lithium carbon- ate with the extraction of brine through production wells. From the wells, the brine is pumped into large solar evaporation ponds where it will evaporate up to 6% Li concentration. From there, the 6% lithium brine will be transported to a processing plant to be built in the town of Fiambala, approximately 160 km from the 3Q project. Finally, the product is dried, classified and packed. Neo Lithium Corp. represents an ad- vanced-stage lithium brine project with attractive economics in a sector with an increasing demand for energy metals. The company has over $60 million in cash, no debt and 117.1 million shares outstanding.

Articles in this issue

Links on this page

Archives of this issue

view archives of Resource World Magazine - Resource World - February-March 2018 - Vol 16 Issue 2